Block C Extension
Beirut, Lebanon
800sq.m
2002
Executive Floor Renovation
100sq.m
2003
Adlieh HQ
5,000sq.m
Campus Access
N/A
2008
Saida Branch Renovation
Saida, Lebanon
1,300sq.m
Tripoli Branch Renovation
Tripoli, Lebanon
2,400sq.m
Executive Offices
130sq.m
Archive Room Fire Suppression System
600sq.m
2009
Training Center
240sq.m
Upgrade of 5MW Power Plant
5MW
Upgrade of Power Transformer Plant
2MW
Design of Power Factor Correction System
2010
Design of Security Countermeasures
1km perimeter
Bickfaya Branch Renovation
Bickfaya, Lebanon
2,500sq.m
2011
Block D Extension
2,600sq.m
Block E
8,000sq.m
Retrofitting of Fire Protection for Main Staircase
Structural Consolidation
Dekwaneh, Lebanon
15,000sq.m
2012
UPS Infrastructure Upgrade
Design of Infrastructure Service Tunnel
2013
Midclear Offices
1,500sq.m
Perimeter Security Design
500m perimeter
Saifi 459
1,200sq.m
Fire Suppression Systems (all branches)
Various, Lebanon
19 systems
2014
4th Floor Renovation
Ground Floor Renovation
1,000sq.m.
Conference Center
500sq.m
Block A Extension
1,000sq.m
2015
5th Floor Renovation
Fifth Floor Extension
400sq.m
Plot 40 Parking Lot Civil Works
4,000sq.m
Design of Outer Perimeter Cameras
Lebanon
50 cameras
2016
Design of Elevation Lighting
2017
Design of Main Generator Plant
500KVA
Retrofitting of Fire Fighting Riser
Design and Supervision of Central Water Treatment Plant
Capital Markets Authority HQ
2018
Design and Supervision of Control Room Digital Upgrade
Security Gate & Vetting Area
Upgrade of Campus Surveillance
30 cameras
Assessment of Existing Electrical Infrastructure for HQ Building
2019
Upgrade of Access Control Devices
Sour Branch Renovation
Tyr, Lebanon
Design & Sup. on Entrance Deck Restoration
2,000sq.m
2020
Design of New HQ Offices
Dbayeh, Lebanon
Design of Vertical Farming Industrial Facility
Ajman, UAE
2021
Industrial Facility Installation Drawings
Dlebta, Lebanon
Baalbeck Branch
Baalbeck, Lebanon
Ongoing
Design & Sup. on Renovation of Existing Building
Settlement Permit for Campus
30,000sq.m.